Информация
Bollard for outdoor applications
surface mounted (floor)
8W
230Vac
Lumen output at source: 488 lm (3000K)
Delivered lumen output: 173 lm (3000K)
1 power LED, 3 MacAdam steps, 50000h L90 B10 (Ta 25°C)
LED colour: 2700K, 3000K, 4000K
Optics: asymmetrical
body in steel, head in Anticorodal® aluminium, screen in serigraphed, tempered extra-clear glass
Finishes: white, grey, anthracite, cor-ten
built-in power supply unit
Ingress protection: IP65
Impact resistance: IK07
non-standard heights available on request
Operating temperature: -20°C — +45°C
Maximum device temperature: 50°C (Ta 25°C)
Glow wire test: 960°
Photobiological safety: risk group 1 according to EN6 2471:2006
Appliance class: I
Weight: 1800 g
Dimensions: Ø125x285 mm
Energy efficiency class: A / A+ / A++







