Информация
Xenia_AF PRO is a bar with super warm LED light source and flood light distribution composed of 3 powerled LEDs with CCT 2700 K and CRI 80
the source luminous flux is 561 lm, with a 124.7 lm/W nominal luminous efficacy.
The device body is made of aluminium 6060 and features a anodised aluminum finish, processed by means of 20 µm anodizing
the diffuser is made of extra clear glass - tempered with a silk-screening treatment. The ingress protection degree is IP68.
Light source:
- 3 x powerLEDs 4.5W DC 500mA
- 6 x powerLEDs 7.4W DC - 8.3W AC
- 90-264V | 12 x powerLEDs 14.8W DC - 16.5W AC
- 100-277V | 24 x powerLEDs 29.6W DC - 33.2W AC
- 100-277V | 30 x powerLEDs 37W DC - 41.3W AC
- 198-264V AC /176-276V DC | 12 x powerLEDs 8.4W DC - 10.1W AC
- 198-264V AC /176-276V DC | 18 x powerLEDs 12.8W DC - 14.4W AC
- 198-264V AC /176-276V DC | 24 x powerLEDs 17.1W DC - 19.1W AC
- 198-264V AC /176-276V DC | 30 x powerLEDs 21.4W DC - 24W AC
















